Airport Re-fueling Service at New U-Tapao International Airport Project. Engineering, Design and Construction Works, Ban Chang Rayong.

Client:

Global Aero Associates Company Limited. (GAA, JV BAFS-PTTOR) , Index International Group Public Company Limited.

Consultant:

Brightstar Asia Ltd., Alana Engineering Co., Ltd.

Contract Period:

November 2021 - January 2025

Scope of Work:
  • Aviation Refueling System, Engineering, Procurement and Construction (EPC) Project.
  • Jet Fuel/Oil Storage Tank, Fire Water Tank, Under-Ground Storage Tank,
  • Truck Loading Gantry (Unloading), Aviation Test Rig and Metering System.
  • Jet Fuel Underground Hydrant System and Cathodic Protection System.
  • Aviation Fuel Pumps, Piping and Fuel Distribution & Control System.
  • Civil, Structural and Architectural Works.
  • Aviation Control Room and Operation/Office Building.
  • MEP. and Utility Works.
  • Objective Note   : Aviation fuel 18,000 m3 storage, underground hydrant 16” approx. 20 Km. for support 15 M. passenger/year.